ROV '86 : Remotely Operated Vehicles [Libro electrónico] / Robert L. Wernli, Roger Chapman
Por: Wernli, Robert L [autor/a].
Chapman, Roger [autor/a].
Tipo de material: Libro en línea Editor: Reino Unido: Graham & Trotman, c1986Descripción: 366 páginas : fotografías, ilustraciones ; centímetros.ISBN: 9401083673; 9789401083676; 9789400942073 (Online).Nota de acceso: Disponible para usuarios de ECOSUR con su clave de acceso Nota de bibliografía: Incluye bibliografía Número de sistema: 56824Resumen:Tipo de ítem | Biblioteca actual | Colección | Signatura | Estado | Fecha de vencimiento | Código de barras |
---|---|---|---|---|---|---|
Libros | Biblioteca Electrónica Recursos en línea (RE) | Acervo General | Recurso digital | ECO400568248612 |
Incluye bibliografía
Disponible para usuarios de ECOSUR con su clave de acceso
There is now an awareness within the industry, particularly as oil companies direct considerable resources towards developing diverless production systems, that a fully integrated approach to equipment design and intervention is necessary to achieve an acceptable system. The requirement for an integrated approach to equipment design and intervention is applicable not only to diverless depths but to all subsea structures, equipment and intervention techniques in whatever depth. Fortunately the inherent dexterity of the diver does not impact so severely on design as other intervention techniques. However the benefits of an integrated approach are still applicable and the use of such simple "diver aids" as cutting guides and subsea markings installed prior to the installation of jackets and subsea equipment can have a significant impact on the cost of intervention. This paper examines the requirements and limitations in designing subsea equipment for Remotely Operated Vehicle (ROV) intervention. For the oil company embarking on the development of a diverless production system, be it totally diverless because of the envisaged water depth or primarily diverless with the possibility of diver back up, the intervention techniques adopted will strongly influence the final system design. The necessity to undertake an extensive development programme to produce the optimum intervention system is very costly, requires long lead times and comprehensive testing particularly where novel solutions are adopted. It is a daunting prospect for even the most progressive of oil companies. eng
Disponible en línea
Disponible en formato PDF
Subscripción a ELSEVIER 26 de diciembre del 2013